There are scheduled improvements and a new traffic pattern to be installed on Wall Road on Tuesday May 26, 2026 and Wednesday May 27, 2026.
Spring Lake Heights with Fernandes Construction will be installing traffic line striping along all of Wall Road west of Highway 71 as well as an All Way Stop at the intersections of Greve Avenue and Windsor Terrace.
Work begins at 6:30 am and continues until 5:00 pm or later as necessary.
All vehicles must be removed from Wall Road by 6:00 am on Tuesday May 26 in preparation of Street Sweeping and Striping. Vehicles will be towed at the owners expense after 6:00 am.
Access to Wall Road will be very limited and residents will have limited access to their driveway when work is near their residence.
Garbage Collection for Wall Road residents west of Highway 71 will be at 6:00 am sharp at the curb. The trucks will not be able to return for collection after this time.
Police will be present to assist with traffic. Please obey all closures and detours. As always, please drive with caution. Thank you for your anticipated cooperation and understanding.