CURB, SIDEWALK AND APRON REPLACEMENT ALONG OCEAN ROAD WILL BEGIN ON TUESDAY, NOVEMBER 11, 2025

Ocean Road approximately from 6th Avenue to Shore Road in Spring Lake will have limited access. Work house are 7:00am to 5:00pm or later as necessary. All vehicles must be removed from the roadway and/or driveways by 7:00am. Driveways will be inaccessible when work is near the residence.

If there any problem with sprinkler heads or drain pipes contract the Fernandes Construction Inc. @ 732-266-4816

WE APOLOGIZE IN ADVANCE FOR ANY INCONVENIENCE.
– Fernandes Construction, Inc. in cooperation with Borough of Spring Lake Heights –